Re: Boeing E-7 Wedgetail (RAF)
Murmurs from a friend at Lossie & from a work colleague whose "friend" works at Boeing that the other 2 will be ordered making it 5
Take it with a super large pinch of salt mind you.
Take it with a super large pinch of salt mind you.
-
- Senior Member
- Posts: 1144
- Joined: 20 Nov 2021, 19:12
-
- Member
- Posts: 86
- Joined: 26 May 2021, 11:45
Re: Boeing E-7 Wedgetail (RAF)
Engines and most of the tail on the 1st aircraft with a lot of the modification along the top of the aircraft in place.
Looks like the 2nd aircraft also has the bracket for the radar installed.
Re: Boeing E-7 Wedgetail (RAF)
Its not a bracket added to the fuselage they actually remove the whole upper fuselage section and replace it with a custom one shipped in from the states.
Re: Boeing E-7 Wedgetail (RAF)
It’s a series of fuselage frames with lug attachments (brkts if you like) at the top to attach the radar and fairing mounts, the new crown panel nests round that.
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
-
- Senior Member
- Posts: 2762
- Joined: 03 Aug 2016, 20:29
Re: Boeing E-7 Wedgetail (RAF)
FFS so we could end up with just 3?SW1 wrote: ↑02 Dec 2022, 21:44 It’s a series of fuselage frames with lug attachments (brkts if you like) at the top to attach the radar and fairing mounts, the new crown panel nests round that.
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
Re: Boeing E-7 Wedgetail (RAF)
Unless something else goes to free up more money. It all goes back to the decision to buy 9 p8 at like with the wedgetail the budget or crews simply weren’t there and sentinel and the aew force are being cut to compensate.dmereifield wrote: ↑03 Dec 2022, 08:43FFS so we could end up with just 3?SW1 wrote: ↑02 Dec 2022, 21:44 It’s a series of fuselage frames with lug attachments (brkts if you like) at the top to attach the radar and fairing mounts, the new crown panel nests round that.
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
Re: Boeing E-7 Wedgetail (RAF)
As it currently stands there isn't even a business case to buy three. The whole procurement seems in a mess. What MOD thought they were getting and what Boeing thought they were supplying when it was agreed to buy five with the money allocated for E3 upgrade seems to be the root of it. Hence the cut to three, the bare minimum. But it looks like three is still too expensive. The NAO report on this one is going to be interesting.dmereifield wrote: ↑03 Dec 2022, 08:43FFS so we could end up with just 3?SW1 wrote: ↑02 Dec 2022, 21:44 It’s a series of fuselage frames with lug attachments (brkts if you like) at the top to attach the radar and fairing mounts, the new crown panel nests round that.
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
-
- Member
- Posts: 122
- Joined: 23 Nov 2019, 00:01
Re: Boeing E-7 Wedgetail (RAF)
At least with the USAF program for 20+ aircraft commencing, there should be the option of buying two or three additional aircraft off the Boeing production line in the future. It will take time to deliver the USAF fleet, so that option will be there for some time.SW1 wrote: ↑03 Dec 2022, 08:56Unless something else goes to free up more money. It all goes back to the decision to buy 9 p8 at like with the wedgetail the budget or crews simply weren’t there and sentinel and the aew force are being cut to compensate.dmereifield wrote: ↑03 Dec 2022, 08:43FFS so we could end up with just 3?SW1 wrote: ↑02 Dec 2022, 21:44 It’s a series of fuselage frames with lug attachments (brkts if you like) at the top to attach the radar and fairing mounts, the new crown panel nests round that.
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
Re: Boeing E-7 Wedgetail (RAF)
As the nice lady from Boeing with her odd Aussie accent said at the recent Defence Committee meeting the only 'production line' currently is the one in the UK.SouthernOne wrote: ↑03 Dec 2022, 21:54At least with the USAF program for 20+ aircraft commencing, there should be the option of buying two or three additional aircraft off the Boeing production line in the future. It will take time to deliver the USAF fleet, so that option will be there for some time.SW1 wrote: ↑03 Dec 2022, 08:56Unless something else goes to free up more money. It all goes back to the decision to buy 9 p8 at like with the wedgetail the budget or crews simply weren’t there and sentinel and the aew force are being cut to compensate.dmereifield wrote: ↑03 Dec 2022, 08:43FFS so we could end up with just 3?SW1 wrote: ↑02 Dec 2022, 21:44 It’s a series of fuselage frames with lug attachments (brkts if you like) at the top to attach the radar and fairing mounts, the new crown panel nests round that.
https://breakingdefense.com/2022/12/uk- ... -programs/
Elsewhere, an average supplier lead time increase of 244 days for E-7 parts has led Boeing to delay a first aircraft delivery to RAF Lossiemouth, Scotland, until 2024. The new schedule change comes after the RAF admitted in October 2022 that an original target of initial operating capability for the new early warning aircraft of 2023 had been delayed until 2024, without further elaboration.
As for the financial burden, in the hearing Keeling said that she was “not able to discuss” costs for the E-7 program as the MoD has still to sign off on the full business case, a key document that covers items like costs and schedule, expected to be approved in 2023.
“We were certainly set some cost savings to keep the program and that is what we are committed to delivering,” she explained.
Under the original order for five aircraft in 2019, Boeing and the UK agreed to a $1.98 billion deal, but there remains disquiet over E-7 project management issues. “It has sort of come to light that the budget for three aircraft is going to be not that dissimilar to the budget for five because of the gross underestimate of costs made by the MoD,”
The US programme is for one rapid prototype for delivery in FY27 and a second to follow that. Also the US Air Force seem to be focusing on battlespace management and moving target indication contrary the AWACS focus of the current E7s. Whose to say in 2030 the by then production E7, if it goes into production, is anything like the UK version.
US Air Force press release:
https://www.af.mil/News/Article-Display ... apability/A contract award is planned in fiscal year 2023.
The FY23 President’s Budget request includes $227 million in Research, Development, Test and Evaluation funds starting in FY23. These funds support the acquisition of a rapid prototype aircraft planned to deliver in FY27.
The notional schedule plans for a second rapid prototype aircraft funded in FY24, and a production decision in FY25 to continue fielding aircraft.
Re: Boeing E-7 Wedgetail (RAF)
And who is to say that by then we haven't changed what we want the aircraft to do at that time...?
Re: Boeing E-7 Wedgetail (RAF)
I don't see our requirement for AWACS capability going away. If MTI was important to us why did we bin sentinel?
-
- Member
- Posts: 122
- Joined: 23 Nov 2019, 00:01
Re: Boeing E-7 Wedgetail (RAF)
The USAF is buying the E-7 to replace the E-3, so the focus remains on airborne targets and the aerial battle space. Sentinel dealt with surveillance of the ground battle space, much like the USAF E-8 JSTARS platform. Like the RAF with Sentinel, the USAF is retiring its E-8 JSTARS without replacement, as it's no longer viewed as a survivable platform or mode of operation.
Publicly announced changes that the USAF will be making to the E-7 seem pretty minor, with some already in development for the RAAF upgrade program ie an open architecture battle space management systems that has already been flight tested on a RAAF plane.
Re: Boeing E-7 Wedgetail (RAF)
Have you read the USAF press release I quote:SouthernOne wrote: ↑05 Dec 2022, 00:56The USAF is buying the E-7 to replace the E-3, so the focus remains on airborne targets and the aerial battle space. Sentinel dealt with surveillance of the ground battle space, much like the USAF E-8 JSTARS platform. Like the RAF with Sentinel, the USAF is retiring its E-8 JSTARS without replacement, as it's no longer viewed as a survivable platform or mode of operation.
Publicly announced changes that the USAF will be making to the E-7 seem pretty minor, with some already in development for the RAAF upgrade program ie an open architecture battle space management systems that has already been flight tested on a RAAF plane.
The Boeing E-7 is the only platform capable of meeting the requirements for the Defense Department’s tactical battle management, command and control and moving target indication capabilities within the timeframe needed to replace the aging E-3.
-
- Member
- Posts: 122
- Joined: 23 Nov 2019, 00:01
Re: Boeing E-7 Wedgetail (RAF)
Not sure what significance you're attaching to that terminology, as aircraft in flight are definitely "moving targets" that can't be tracked with current satellite technology. The trigger for USAF procurement of the E-7 seems to be have been the assessment that anticipated space based (satellite) systems will not be capable of detecting and tracking in flight aircraft for the foreseeable future.tomuk wrote: ↑05 Dec 2022, 04:33Have you read the USAF press release I quote:SouthernOne wrote: ↑05 Dec 2022, 00:56The USAF is buying the E-7 to replace the E-3, so the focus remains on airborne targets and the aerial battle space. Sentinel dealt with surveillance of the ground battle space, much like the USAF E-8 JSTARS platform. Like the RAF with Sentinel, the USAF is retiring its E-8 JSTARS without replacement, as it's no longer viewed as a survivable platform or mode of operation.
Publicly announced changes that the USAF will be making to the E-7 seem pretty minor, with some already in development for the RAAF upgrade program ie an open architecture battle space management systems that has already been flight tested on a RAAF plane.The Boeing E-7 is the only platform capable of meeting the requirements for the Defense Department’s tactical battle management, command and control and moving target indication capabilities within the timeframe needed to replace the aging E-3.
Perhaps the RAF use different terminology to RAAF and USAF?
Re: Boeing E-7 Wedgetail (RAF)
AMTI isn't a really a thing airborne radars have been pulse doppler for years. Using MTI in the press release purely about detecting aircaft is very unusual.
Re: Boeing E-7 Wedgetail (RAF)
Exactly. So the aircraft has that, at least. And when you consider the maritime surveillance modes the aircraft has, I wouldn't be surprised if there are surface modes using MTI capabilities. So just casually mentioning that the aircraft is capable of using MTI modes is not incorrect, yet I don't think it's trying to replace the E-8 JSTARS either. They would say so, explicitly, if that was the case. They have not. At best, IMHO, the USAF is looking to introduce some improved modes. Who knows? There's a lot software can do to tweak the performance of the radar.
Just my reading of the whole situation.