Ajax Armoured Vehicles (British Army)
Re: Ajax Armoured Vehicles (British Army)
Well considering the majority of our Armoured Vehicles were built decades ago, and health and safety at the time is no where it is now, probably means that a new headset is needed across the board. However Ajax WAS designed with health and safety as it is now or very near to it and so the noise issues are a viable concern. Even with the new crew headsets there would also be noise issues for the dismounts in the Ares version, though a typical bodge job like having the dismounts where vehicle headsets whilst on board and then removing them and putting on their normal headgear may be the type of solution the MoD arrives at.
Regarding the hull, are the reports of the quality control being not up to scratch and hulls not being correctly aligned just lies? Surely if they aren't then that is going to affect the suspension etc. whilst the vehicle is moving?
Regarding the hull, are the reports of the quality control being not up to scratch and hulls not being correctly aligned just lies? Surely if they aren't then that is going to affect the suspension etc. whilst the vehicle is moving?
Re: Ajax Armoured Vehicles (British Army)
I’d suggest that the reports are often misrepresentations. Each time I see a report the error has grown another foot.Lord Jim wrote:Regarding the hull, are the reports of the quality control being not up to scratch and hulls not being correctly aligned just lies? Surely if they aren't then that is going to affect the suspension etc. whilst the vehicle is moving?
Re: Ajax Armoured Vehicles (British Army)
Personal Injury lawyers are going to have a field day if it turns out soldiers suffered hearing loss due to inadequate PPE.
I'm not sure what the mod thought it would gain if it turns out the noise issues are down to the head sets, they really should have been supplied by GD if it's a new vehicle.
The vibration issues I'm still lost how a hull and mounting points that would have been CNC machined cannot be perfectly square. Maybe the suspension is a carry over from the original 25t Ascod. If you look at it's handling characteristics in trials against the AS21 redback in Australia it doesn't look the smoothest. I'm not sure how much the rubber tracks play a part but worth considering making the switch if they are rated for 50t according to the manufacturer.
Problem sorted sign off acceptance testing, declare IOC job done
I'm not sure what the mod thought it would gain if it turns out the noise issues are down to the head sets, they really should have been supplied by GD if it's a new vehicle.
The vibration issues I'm still lost how a hull and mounting points that would have been CNC machined cannot be perfectly square. Maybe the suspension is a carry over from the original 25t Ascod. If you look at it's handling characteristics in trials against the AS21 redback in Australia it doesn't look the smoothest. I'm not sure how much the rubber tracks play a part but worth considering making the switch if they are rated for 50t according to the manufacturer.
Problem sorted sign off acceptance testing, declare IOC job done
Re: Ajax Armoured Vehicles (British Army)
The hull isn’t machined out of a block of RHA, It’s a welded box. Welding tends to introduce variation. You can machine after welding, if you can get the machine to what you want cut.BB85 wrote:I'm still lost how a hull and mounting points that would have been CNC machined cannot be perfectly square
Also nothing is perfectly square, there is always variation. The more you spend, the less variation there is.
-
Online
- Senior Member
- Posts: 1344
- Joined: 06 May 2015, 20:52
Re: Ajax Armoured Vehicles (British Army)
That's been going on for years. I don't know many ex-forces personnel that don't have hearing issues.BB85 wrote: Personal Injury lawyers are going to have a field day if it turns out soldiers suffered hearing loss due to inadequate PPE.
Why? The headsets are Bowman across the fleet.BB85 wrote: I'm not sure what the mod thought it would gain if it turns out the noise issues are down to the head sets, they really should have been supplied by GD if it's a new vehicle.
You don't machine from a block. Plates are cut, jigs assembled, welding done.BB85 wrote: The vibration issues I'm still lost how a hull and mounting points that would have been CNC machined cannot be perfectly square.
The generic steel fabrication issues are variations in flatness of slabs provided, and then any hot work further distorts and weakens. This isn't news to anyone that fabricates steel, but there's always variation in such assemblies.
Re: Ajax Armoured Vehicles (British Army)
For the hulls not to be square and outside tolerances, something must have been wrong with the jigs used, or how they were used.
Re: Ajax Armoured Vehicles (British Army)
“Square” is also a measurement that tolerances apply to.Lord Jim wrote:For the hulls not to be square and outside tolerances, something must have been wrong with the jigs used, or how they were used.
If things are out of tolerance, that’s a problem, but generally not an insurmountable one. If it’s been found internally, then you’d expect the supplier (GD) to fix the out-of-tolerance parts before delivery to the customer.
Re: Ajax Armoured Vehicles (British Army)
Wasn't that the issue they had in Spain though, hulls manufactured for the Ajax programme were outside of tolerances and this was discovered at GSUK's site when they went to complete the hulls there.
Regardless, it is amazing how quiet things have become for all things Ajax.
Regardless, it is amazing how quiet things have become for all things Ajax.
Re: Ajax Armoured Vehicles (British Army)
I read up that RUSI article again last night. There definitely are issues with the hulls being fabricated outside of tolerance especially the initial 100. If that's the case how long would it take to fabricate new ones built to spec, strip the old hulls and assemble the new hulls where at least they know they are built to spec and test for vibration again.
Re: Ajax Armoured Vehicles (British Army)
Depends on what is out of tolerance and by how much, which would dictate whether it needs to be reworked or replaced.BB85 wrote:I read up that RUSI article again last night. There definitely are issues with the hulls being fabricated outside of tolerance especially the initial 100. If that's the case how long would it take to fabricate new ones built to spec, strip the old hulls and assemble the new hulls where at least they know they are built to spec and test for vibration again.
Re: Ajax Armoured Vehicles (British Army)
More "no problem here, move along" posts here I see.
PS replacing the tracks with rubber ones would presumably help with the vibration and noise issues but having the tracks absorb excess vibrations would shorten their lives. IOW no such thing as a free lunch.
PPS and despite the CDS winks and nudges, excess noise in a reconn vehicle is not in the best interests of their crews
PS replacing the tracks with rubber ones would presumably help with the vibration and noise issues but having the tracks absorb excess vibrations would shorten their lives. IOW no such thing as a free lunch.
PPS and despite the CDS winks and nudges, excess noise in a reconn vehicle is not in the best interests of their crews
Re: Ajax Armoured Vehicles (British Army)
I would love to know how Ajax stacked up compared to Lynx and AS21 Redback. The Aussies where very quiet on why it didn't meet their requirements. I know the other two are technically IFV's but if the digital architecture is fully networked and allows them consume and process the same data to track and engaged targets on the battlefield from well beyond visual range in real time they effectively combine the Scout and IFV role into 1. I actually think Ajax has taken so long to bring into service Lynx and AS21 have left it behind.
Re: Ajax Armoured Vehicles (British Army)
Technically the GD offering to Land400 phase 3 wasn’t Ajax at all, but Ascod 2, but I agree that it would be interesting to know the assessment as there will be some common features.BB85 wrote:I would love to know how Ajax stacked up compared to Lynx and AS21 Redback. The Aussies where very quiet on why it didn't meet their requirements. I know the other two are technically IFV's but if the digital architecture is fully networked and allows them consume and process the same data to track and engaged targets on the battlefield from well beyond visual range in real time they effectively combine the Scout and IFV role into 1. I actually think Ajax has taken so long to bring into service Lynx and AS21 have left it behind.
Re: Ajax Armoured Vehicles (British Army)
As reported by Aussie technical journalists, Ajax was rejected because a) they didn't like the turret, they had previously rejected it in the CRV program, b) their contacts in the British Army advised they should keep well clear, and c) was too small.
I say Ajax because the vehicle supplied by GD for them to take a look at was an Ajax variant. Ares?
I say Ajax because the vehicle supplied by GD for them to take a look at was an Ajax variant. Ares?
Re: Ajax Armoured Vehicles (British Army)
Of those concerns only the British Army’s opinion is pertinent to Ajax. The down-select was back in late 2019 so it would be informative to our current situation to know what drove those opinions.Ron5 wrote:As reported by Aussie technical journalists, Ajax was rejected because a) they didn't like the turret, they had previously rejected it in the CRV program, b) their contacts in the British Army advised they should keep well clear, and c) was too small.
I say Ajax because the vehicle supplied by GD for them to take a look at was an Ajax variant. Ares?
I’d also be interested to know what ruled CV90 out, particularly with the interest in it from this and other forums.
Re: Ajax Armoured Vehicles (British Army)
mr.fred wrote: I’d also be interested to know what ruled CV90 out, particularly with the interest in it from this and other forums.
From https://www.australiandefence.com.au/de ... 3-decision. On some other places I found same explanation, but they could originate from the same rumor. So it might or might not be true but it sound very plausible. If I am not wrong with CV90, BAe has policy to build hulls in Sweden while tings like turrets are usually produced/assembled in the country which is procuring them. That also might be an issue.According to informed sources, the AJAX was regarded as not fit for purpose, and the BAE Systems-Hagglunds CV90 was assessed as too expensive.
Even tho I am a great fan of CV90, IMO, if British Army decide to replace Warriors with tracked IFV, it might not be a bad idea to go with some solution which would give them chance to produce whole or majority of the vehicle at home just for a sake of retaining capability to produce such vehicles. In that case vehicles like Lynx might not be a bad choice, considering for example that 172 out of 218 Hungarian Lynx should be built locally in new factory and current Rheinmetall presence in UK. But that is just my opinion, of course, British Army should do why they consider is best for them.
- ArmChairCivvy
- Senior Member
- Posts: 16312
- Joined: 05 May 2015, 21:34
Re: Ajax Armoured Vehicles (British Army)
Army-technology.com has provided a price tag (warning: 3-way ccy conversions ahead ) for the quantity we would requiresol wrote:considering for example that 172 out of 218 Hungarian Lynx should be built locally in new factory and current Rheinmetall presence in UK
"Rheinmetall Protection Systems has been contracted to equip Hungary’s new Lynx infantry fighting vehicles (IFVs) with StrikeShield hard-kill active protection system (APS).
The more than $170m (€140m) order will involve the installation of the APS on 209 Hungarian Lynx IFVs.
The Lynx IFV is an advanced, highly protected, tracked armoured vehicle developed by Rheinmetall.
Last September, Hungary became the first Nato and EU member state to order the Rheinmetall Lynx IFV in a deal worth €2bn (£1.82bn)"
- but nothing is said about the facilities cost for the local manufacture/ assembly
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)
If everyone is thinking the same, then someone is not thinking (attributed to Patton)
Re: Ajax Armoured Vehicles (British Army)
As CV90 was expected to be one of the lowest priced (if not the lowest) finalists, some Aussies took that to mean that Bae's plan for local production was crap. Which agrees with your comments.sol wrote:BAE Systems-Hagglunds CV90 was assessed as too expensive.
Re: Ajax Armoured Vehicles (British Army)
Ajax Program has recieved its final cannon,,,,,,
https://www.shephardmedia.com/news/land ... ct-cannon/
https://www.shephardmedia.com/news/land ... ct-cannon/
Re: Ajax Armoured Vehicles (British Army)
Well there are option for the cannons that are currently surplus. Nexter has fitted a remote turret to its VBCI in an attempt to win an ongoing contract, equipped with a CTA40 Cannon and two ATGW. It would not take a lot to fit the same turret to a Boxer Mission Module as according to ARTEC such a programme would only require ensuring the turret would work with the Module rather than testing the whole vehicle. That would leave user trails by the Army to make sure everything is bolted down as ARTEC would have ensured it met all the necessary standards before handing any vehicles over. They say this is one of the main benefits of the modular system and radically different saving significant time and money compared to traditional introduction of modified vehicles.
If we use the Lithuanian example if we decided to go down this route with a number of Boxers using the surplus cannon, we could have such vehicles in service by 2025, allowing the first Heavy BCT to have greater firepower than it would have with simply Boxer APC variants and at a reasonable cost as the cannons would be GFE. As for the ATGE, the Nexter turret uses the MMP missile, but it should be possible to install Javelin or one of the Spike family.
Of course we could always see if the French would want two hundred odd cannons at a reduced price if we don't want them, keeping a few as spares.
If we use the Lithuanian example if we decided to go down this route with a number of Boxers using the surplus cannon, we could have such vehicles in service by 2025, allowing the first Heavy BCT to have greater firepower than it would have with simply Boxer APC variants and at a reasonable cost as the cannons would be GFE. As for the ATGE, the Nexter turret uses the MMP missile, but it should be possible to install Javelin or one of the Spike family.
Of course we could always see if the French would want two hundred odd cannons at a reduced price if we don't want them, keeping a few as spares.
Re: Ajax Armoured Vehicles (British Army)
I'm curious to see how the jaguar performs on the export market. I know they won a decent contract with the Belgian armed forces but politics might have been at play there. The CTA cannon has not received any interest from anyone due to the cost of ammo, bit if Jaguar price is 1 million euro it's bound to be considered in a lot of export competitions.
If it is the mod might try to sell some of their surplus canons to nextar.
If it is the mod might try to sell some of their surplus canons to nextar.
Re: Ajax Armoured Vehicles (British Army)
The Jaguar seems to have bee the model for the the T31 contract - build us an armoured vehicle for EUR1 million, then we can bolt on all the stuff that makes it useful afterwards
The pessimist sees difficulty in every opportunity. The optimist sees the opportunity in every difficulty.
Winston Churchill
Winston Churchill
Re: Ajax Armoured Vehicles (British Army)
DefenceNews article from 2017:
https://www.defensenews.com/land/2017/0 ... cle-order/An estimated unit price of a Griffon is about €2.2 million to €2.3 million (U.S. $2.4 million to U.S. $2.5 million), depending on the arms and equipment fitted, while the unit price of the Jaguar is €4.5 million to €5 million, an industry executive said.
Re: Ajax Armoured Vehicles (British Army)
Yes, the expensive stuff like sights, weapons, gun control, engines…
Here’s the source for €6m
https://www.assemblee-nationale.fr/dyn/ ... pport-avis
I.B.1.a
“un programme d’engin blindé de reconnaissance et de combat (EBRC), appelé Jaguar. Son coût unitaire s’établit à six millions d’euros.”
“ an armoured reconnaissance and combat vehicle (EBRC) program, called Jaguar. Its unit cost is six million euros.”