UK Future Vertical Lift Programme

Contains threads on Royal Air Force equipment of the past, present and future.
SW1
Senior Member
Posts: 4090
Joined: 27 Aug 2018, 19:12
Has liked: 179 times
Been liked: 441 times
United Kingdom

Re: UK Future Vertical Lift Programme

Post by SW1 »


NickC
Donator
Posts: 1214
Joined: 01 Sep 2017, 14:20
Has liked: 6 times
Been liked: 31 times
United Kingdom

Re: UK Future Vertical Lift Programme

Post by NickC »

SW1 wrote: 18 May 2022, 13:33
Understood the retreating blade stall phenomenon of the rotor blades limits the forward speed of conventional helicopters and kicks in around 175 knots or less, after that it gets very expensive, more power required, wings to share the lift, further complicated/heavy transmission, retractable landing gears etc.

Question is what the is the payback for this no doubt very expensive option.

SW1
Senior Member
Posts: 4090
Joined: 27 Aug 2018, 19:12
Has liked: 179 times
Been liked: 441 times
United Kingdom

Re: UK Future Vertical Lift Programme

Post by SW1 »

These users liked the author SW1 for the post (total 2):
RunningStrongJensy

SW1
Senior Member
Posts: 4090
Joined: 27 Aug 2018, 19:12
Has liked: 179 times
Been liked: 441 times
United Kingdom

Re: UK Future Vertical Lift Programme

Post by SW1 »

Bell textron wins is army Blackhawk replacement program

These users liked the author SW1 for the post (total 2):
HalidonLittle J

Post Reply