Re: Project Crowsnest- status?

Post by ArmChairCivvy »

Jensy wrote:Though of course we'd then probably be short of cabs for the Royal Marines..
There has been quite a shift towards Chinooks, and the carriers coming 'on-line' will only reinforce it
- with the hardhat area of the hangar making the handling and maintaining them 'like back at home'
... why {btw] is the highest area of the hangar called the hardhat area, when the chances of banging your head have been much mitigated against?
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

Scimitar54
Senior Member
Posts: 1701
Joined: 13 Jul 2015, 05:10
United Kingdom

Re: Project Crowsnest- status?

Post by Scimitar54 »

You are effectively taller when you wear a Hard Hat?

Ron5
Donator
Posts: 7249
Joined: 05 May 2015, 21:42
United States of America

Re: Project Crowsnest- status?

Post by Ron5 »

Only if you're a lumberjack that wears high heels, suspenders and a bra.

Scimitar54
Senior Member
Posts: 1701
Joined: 13 Jul 2015, 05:10
United Kingdom

Re: Project Crowsnest- status?

Post by Scimitar54 »

Sounds like a “battle-axe” to me. :mrgreen:

Aethulwulf
Senior Member
Posts: 1029
Joined: 23 Jul 2016, 22:46
United Kingdom

Re: Project Crowsnest- status?

Post by Aethulwulf »

The RN have decided to operate the ASaC and ASW Merlins from just one Squadron, an enlarged 820 NAS. 849 NAS was decommissioned on 21 April, with its personnel moving to 820 NAS.

This decision is to allow the RN to maximise the output from its fleet of 30 Merlin HM2.

From Jane's.

User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Project Crowsnest- status?

Post by ArmChairCivvy »

Makes sense... as we are repeatedly told (here) that Sqdrns are just administrative 'shells'.
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

cyrilranch
Member
Posts: 96
Joined: 01 May 2015, 11:36
United Kingdom

Re: Project Crowsnest- status?

Post by cyrilranch »

Aethulwulf wrote:The RN have decided to operate the ASaC and ASW Merlins from just one Squadron, an enlarged 820 NAS. 849 NAS was decommissioned on 21 April, with its personnel moving to 820 NAS.

This decision is to allow the RN to maximise the output from its fleet of 39 Merlin HM2.

From Jane'es.
Where does 39 Merlin HM2 come from ,I thought only 30 Merlin's were converted :?:

Scimitar54
Senior Member
Posts: 1701
Joined: 13 Jul 2015, 05:10
United Kingdom

Re: Project Crowsnest- status?

Post by Scimitar54 »

Can’t speak for Aethulwulf, but I guess it was Big Finger syndrome (on small keys)! Whilst talking of numbers, I wish that the remaining HM1 Merlins had been upgraded to HM2 and brought back into service!

To combine ASAC and ASW operations under 820NAS for HMS QE is understandable to avoid having separate crews for each function. They will need to be Masters (Not Jacks) of both Trades!

Does this not point to a Separate (Combined) Squadron for HMS PoW also? :mrgreen:

Aethulwulf
Senior Member
Posts: 1029
Joined: 23 Jul 2016, 22:46
United Kingdom

Re: Project Crowsnest- status?

Post by Aethulwulf »

Sorry, as suggested 39 was a typo. Should be 30.

I've corrected the post.

User avatar
SKB
Senior Member
Posts: 7931
Joined: 30 Apr 2015, 18:35
England

Re: Project Crowsnest- status?

Post by SKB »


User avatar
SKB
Senior Member
Posts: 7931
Joined: 30 Apr 2015, 18:35
England

Re: Project Crowsnest- status?

Post by SKB »


Little J
Member
Posts: 973
Joined: 02 May 2015, 14:35
United Kingdom

Re: Project Crowsnest- status?

Post by Little J »

So just confirming what we all said, should have used new airframes.
Well done MoD :clap:

serge750
Senior Member
Posts: 1068
Joined: 30 Apr 2015, 18:34
United Kingdom

Re: Project Crowsnest- status?

Post by serge750 »

Wonder how late and expensive the pods would of been !! So much for the cheaper/easier to integrate version :lol: Perhaps they are only doing an interim job until the V22 osprey asac arrives.... :lol:

Scimitar54
Senior Member
Posts: 1701
Joined: 13 Jul 2015, 05:10
United Kingdom

Re: Project Crowsnest- status?

Post by Scimitar54 »

Or the need to convert the remaining Merlin HM1 to HM2 to gain additional airframes is finally recognised. :mrgreen:

Lord Jim
Senior Member
Posts: 7314
Joined: 10 Dec 2015, 02:15
United Kingdom

Re: Project Crowsnest- status?

Post by Lord Jim »

Does anyone expect the CROWSNEST kit to be swapped between airframes anywhere but during maintenance and even then probably during major overhauls in the cycle?

serge750
Senior Member
Posts: 1068
Joined: 30 Apr 2015, 18:34
United Kingdom

Re: Project Crowsnest- status?

Post by serge750 »

Probably more chance of getting a third QEC :lol: should of been dedicated ASAC airframes, minimum of 5 and wire up another 3-4 as back up just incase. don't get me wrong we do need these but...

just a ploy to say we have X amount of availiable ASAC merlins, I can understand why they want more wired up just incase but at the expense of ASW capability, just seems like smoke and mirrors again to do things on the cheap,

Short term thinking again :roll:

IMHO its like buying an MR 2 with a body kit and pretending its a ferrari !

Scimitar54
Senior Member
Posts: 1701
Joined: 13 Jul 2015, 05:10
United Kingdom

Re: Project Crowsnest- status?

Post by Scimitar54 »

Another parallel might be having a fast rally car and a slow service vehicle. The powers that be decide that it would be better to put the mechanic in the rally car and the racing driver in the service vehicle because that way rally car and service vehicle will be closer together.
The point is (in fiction as in reality) that the powers that be are MISSING THE WHOLE POINT OF HAVING A CAPABILITY! :mrgreen:

User avatar
SKB
Senior Member
Posts: 7931
Joined: 30 Apr 2015, 18:35
England

Re: Project Crowsnest- status?

Post by SKB »

Click to enlarge:
Image
(NavyLookout/@NicDibNick) 7th August 2020
Against the clock… development flying for CROWSNET system continues. Merlin Mk2 ZH833 seen over Somerset 4/8/20

User avatar
Ianmb17
Member
Posts: 145
Joined: 01 May 2015, 21:33
United Kingdom

Re: Project Crowsnest- status?

Post by Ianmb17 »


User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Project Crowsnest- status?

Post by ArmChairCivvy »

Was it commented on (at the end of the competition) why the old radome 'style' won over the two AESAs (to match the coverage)?
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

inch
Senior Member
Posts: 1311
Joined: 27 May 2015, 21:35

Re: Project Crowsnest- status?

Post by inch »

Can anybody tell me I believe when deployed next year they will be not fully ready (initial operating capacity) what does that mean ,not all the functions on the system work or what ? Thanks

cyrilranch
Member
Posts: 96
Joined: 01 May 2015, 11:36
United Kingdom

Re: Project Crowsnest- status?

Post by cyrilranch »

ArmChairCivvy wrote:Was it commented on (at the end of the competition) why the old radome 'style' won over the two AESAs (to match the coverage)?
Because this solution was the cheapest option chosen, Thales UK did have AESA antenna produced as a development contact, but MOD Decided not to proceed with it(cost reasons as usual)

User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Project Crowsnest- status?

Post by ArmChairCivvy »

It was never disclosed why the competition was reopened - and the the same winner 'won' again
- unethical cost squeezing? (this is idle speculation, mind you)
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

Ron5
Donator
Posts: 7249
Joined: 05 May 2015, 21:42
United States of America

Re: Project Crowsnest- status?

Post by Ron5 »

cyrilranch wrote:
ArmChairCivvy wrote:Was it commented on (at the end of the competition) why the old radome 'style' won over the two AESAs (to match the coverage)?
Because this solution was the cheapest option chosen, Thales UK did have AESA antenna produced as a development contact, but MOD Decided not to proceed with it(cost reasons as usual)
The Lockheed Martin proposal which was competing against Thales was very technically immature, it would not have made the required in-service dates because of the extensive development needed. Ironically, the Thales version didn't meet the date either but good reason to believe that LM would have been years late instead of months.

Funnily enough, LM made the call to go with Thales and ditched its own product in the process.

Ron5
Donator
Posts: 7249
Joined: 05 May 2015, 21:42
United States of America

Re: Project Crowsnest- status?

Post by Ron5 »

ArmChairCivvy wrote:It was never disclosed why the competition was reopened - and the the same winner 'won' again
- unethical cost squeezing? (this is idle speculation, mind you)
Because Thales fucked up the development and pissed off the lead contractor LM and MoD. At one point LM engineers were sent in to "help" Thales. The MoD asked whether it would be better to ditch Thales and start over hence the re-opening of the competition. I think it was just a scare tactic. The long and gory tale was told someplace, maybe STRN.