Pseudo wrote:that would have gone completely against the entire ethos of the 2010 SDSR [...]
commencing a detailed design programme on a light frigate would have.
First point fully agreed; the second one would have acknowledged that the decision to go away from Surface Combatant 1, 2,3 plan was a mistake. The mistake was forced on the RN as they only went away from it to get any FSC1s!
- so on this one the politicians (Brown, Cameron and Osborne in the same camp!) and the admirals were in cahoots
Tempest414 wrote:6 x type 45s = core crew 195
10 x type 26s all full fat ASW = 130 core crew room 210
10 x Venari 95 Multi- mission ships = 50 core crew + room for 50 extra off board systems crew
10 x low level PSV = core crew 30 per + room for 50 extra off board systems crew
No comment on how many of each, but generically a very good point!
Poiuytrewq wrote:The post Brexit spending review will probably have the biggest influence on what comes after
Just too true: the biggest threat to the UK defence capabilities is the ability to pay!
- next biggest is holding (or not ) alliances together and cohesive (takes two - or more -to tango!)
- and only third is what the OpFor is plotting (as long as they can be deterred)

This is what I meant by my comment (on some other thread) that the defence planning staff/ politicians interface is not quite as good as it should be... for a better defence strategy
- you can always review one that is wanting - and propose incremental enhancements!
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

donald_of_tokyo
Senior Member
Posts: 5545
Joined: 06 May 2015, 13:18
Japan

Re: Current & Future Escorts - General Discussion

Post by donald_of_tokyo »

shark bait wrote:The RN absolutely needs another frigate. Only 14 escorts to protect two carriers and an amphibious group is ridiculous. If that happens the RN really will have bet everything on the carriers and gone bust.
But RN CANNOT man them, without putting precious T23ASWs or T45s into extended readiness. You are happy to ditch 2 T23ASW (extended readiness) to enable 5 T31e coming in? It will be a big reduction in ASW capability. Even if the man-power issue improves, it takes time and not sufficient. On top of it, the "LIFEXed T23s" will be back into the front line very soon.

Again, how can you man those T31e without putting ~2 T23ASW (or T45) into extended readiness?
The issue is replacing the T23's as quickly as they drop out of service. Adding a couple of extra units to the end of the T26 production run does not solve that issue. The RN need a product that can be delivered in 4 years.
I am insisting on two things.

- SDSR20 is man-power first. This is the top priority. The 2nd priority is operational cost (escorts' sea-going days per hull has been 20-30% reduced after ~2015). May be ammunition also important. "More ship" is not higher than 3rd priority for sure.

- Only after man-power issue is solved, RN needs T31e. Just concurrently built them with T26. Since the shipyards differ, there is no problem.


Canceling T31e is not my point. Delaying the decision on T31e to 2021 is the point. It has many merits.

1: the program is already in quite a hurry, significantly increasing risk. As this is a "fixed price contract", higher risk directly means "higher cost". Crystal clear. With fixed price, it means lower standard/armaments. In other words, even if the 1.5Bn investment is unchanged, we are degrading the T31 capability by hurrying.

2: the SDSR2020 is coming quite soon. MOD will fight until X'mas of 2020, and there is a very-very high "risk" of (at least) partly losing the game. The 7-14.8Bn blackhole is real, which means MOD must ask for (more than) 1Bn/yr increase in defense budget. Is it "100% secured?" Surely NOT. Preparing for "further cut" is just normal, far from pessimism. Not thinking of it is very very dangerous. (Even foolish, I'm afraid). If we order T31 on 2020 summer, the only "cut" RN can find is, CVF, T26, and RM, or more man-power and operational cost cuts.... If we are happy with it, RN shall proceed with T31e.

3: And because of today's man-power shortage, 2023's existence of 2 escorts in extended readiness is inevitable, considering the time to train them. So, at least a one-year delay has no impact on RN fleet. Are there any candidate impact?

I think this is logical approach...

User avatar
shark bait
Senior Member
Posts: 6427
Joined: 05 May 2015, 21:18
Pitcairn Island

Re: Current & Future Escorts - General Discussion

Post by shark bait »

Donald san, you present the man power issue as an immovable object, which of course it is not. The Navy (and all the forces) have got a four years to make them self a more attractive employer and stem the huge losses each year. Another part of the solution is modern ships, with better deployment patterns, as well as lower headcounts.

These two parts are both achievable for when the T31 starts to enter service, with lower headcount and by meeting the trained strength allocation the Navy will be able to crew 19 escorts and 2 carriers.
@LandSharkUK

donald_of_tokyo
Senior Member
Posts: 5545
Joined: 06 May 2015, 13:18
Japan

Re: Current & Future Escorts - General Discussion

Post by donald_of_tokyo »

shark bait wrote:Donald san, you present the man power issue as an immovable object, which of course it is not. The Navy (and all the forces) have got a four years to make them self a more attractive employer and stem the huge losses each year. Another part of the solution is modern ships, with better deployment patterns, as well as lower headcounts.

These two parts are both achievable for when the T31 starts to enter service, with lower headcount and by meeting the trained strength allocation the Navy will be able to crew 19 escorts and 2 carriers.
Umm, I'm presenting the man-power issue, "immovable within a few years", not saying "immovable forever". My point is, T31e is coming "in a few years", and I think the problem will not be solved enough to eliminate the "need" for 2 escorts in extended readiness "in a few years".

As such, delaying the start of T31 build is easy. And, delaying T31 decision address much of the "foreseeable" risks on SDSR2020.

As you can see, it is made of two independent assessments. Man power for T31, and keeping T31 as the "first candidate victim" for SDSR2020.

Am I clear?

Aethulwulf
Senior Member
Posts: 1029
Joined: 23 Jul 2016, 22:46
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Aethulwulf »

The total strength of the RN is just over 30000 people. To fully crew every single Royal Navy ship and boat requires just over 8000 people. (Of course the true number at sea is less because some ships/boats are not crewed while in refit or extended readiness.)

Clearly it is always the case that majority of RN personnel are not part of ships' crews. Even when the numbers of RM and Fleet Air Arm are subtracted from the 30000, there are still more personnel ashore than at sea.

The idea that only way to find the numbers to crew ships is to move them from one ship to another and delay the build of new ships is just rubbish. If they wished, in theory the RN could find the numbers needed by reducing shore based posts.

However, this not just a simple numbers accountancy game. All people are not the same. You can not just take a logistics specialist from one ship and magically make them a marine engineer aboard another. Different classes of ships have different requirements for the mix of their crews. For example, it is stupid to think you could easily take the crew from a T23 and a River and use them to crew a T45 (or any of the other swapping ideas that have been discussed here).

User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by ArmChairCivvy »

Aethulwulf wrote: The idea that only way to find the numbers to crew ships is to move them from one ship to another and delay the build of new ships is just rubbish.
Quite. I will not link the MoD manpower statistics after a couple of tries, either, as firm beliefs get repeated without taking the bother to look at statistics (which, of course, are only scratching the surface, for the reason stated above).
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

SW1
Senior Member
Posts: 5657
Joined: 27 Aug 2018, 19:12
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by SW1 »

https://www.google.co.uk/amp/amp.timein ... source=dam

The U.S. Navy’s Sea Hunter unmanned surface vessel has become the first ship of any description to ever sail from San Diego, California to Pearl Harbor, Hawaii and back without the need of a crew for navigation and steering. It’s a significant milestone for this particular vessel and its future cousins, which the service has primarily been developing as anti-submarine warfare platforms, but could also provide electronic warfare support and acting as decoys to help shield friendly forces.

Repulse
Donator
Posts: 4583
Joined: 05 May 2015, 22:46
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Repulse »

shark bait wrote:Only 14 escorts to protect two carriers and an amphibious group is ridiculous.
There are no plans to have a separate ARG at the moment? My reading is that there will be two adaptable CEPP CBGs, one deployed and one at high readiness. My preference of course would be a third CBG whose is the primary “ARG” based around a LPH, but that’s not in the 2% budget without cuts elsewhere.

Whilst it will be tight, 14 Escorts would be enough to operate 2 CSGs plus TAPS plus FRE, especially with the assumption that the UK will not be doing large scale ops solo (not that I necessarily feel comfortable with that assumption).
”We have no eternal allies, and we have no perpetual enemies. Our interests are eternal and perpetual, and those interests it is our duty to follow." - Lord Palmerston

Repulse
Donator
Posts: 4583
Joined: 05 May 2015, 22:46
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Repulse »

Aethulwulf wrote:For example, it is stupid to think you could easily take the crew from a T23 and a River and use them to crew a T45 (or any of the other swapping ideas that have been discussed here).
I don’t think anyone here thinks it easy, but ultimately doable. What doesn’t seem doable is to man 19 Escorts on a sustainable basis with the manning levels we’ve currently got - if it was, why do we have 2 tied up?
”We have no eternal allies, and we have no perpetual enemies. Our interests are eternal and perpetual, and those interests it is our duty to follow." - Lord Palmerston

User avatar
shark bait
Senior Member
Posts: 6427
Joined: 05 May 2015, 21:18
Pitcairn Island

Re: Current & Future Escorts - General Discussion

Post by shark bait »

Repulse wrote:Whilst it will be tight, 14 Escorts would be enough to operate 2 CSGs plus TAPS plus FRE
That a reasonable assumption, but is it a good outcome? It makes the surface fleet a one trick pony, with pretty much zero ability to surge, or protect sea lines of communication through a lengthy operation.

If a cut to 14 escorts is the price paid for two super carriers it will not have been worth the cost.
Repulse wrote: man 19 Escorts on a sustainable basis with the manning levels we’ve currently got
Correct, that needs to be addresses as a priority. The RN is allowed to employ 1,000 more people than it does, and has close to 100 people leaving each month. If conditions are improved and a fraction of people incentivise to stay, the man power pressures can be reduced in a couple of yeas.
@LandSharkUK

User avatar
shark bait
Senior Member
Posts: 6427
Joined: 05 May 2015, 21:18
Pitcairn Island

Re: Current & Future Escorts - General Discussion

Post by shark bait »

SW1 wrote:The U.S. Navy’s Sea Hunter unmanned surface vessel has become the first ship of any description to ever sail from San Diego, California to Pearl Harbor, Hawaii and back without the need of a crew for navigation and steering.
It's quite an achievement and it begs the question, would something similar be useful to the UK in the North Atlantic?
@LandSharkUK

User avatar
Tempest414
Senior Member
Posts: 5552
Joined: 04 Jan 2018, 23:39
France

Re: Current & Future Escorts - General Discussion

Post by Tempest414 »

Repulse wrote:I don’t think anyone here thinks it easy, but ultimately doable. What doesn’t seem doable is to man 19 Escorts on a sustainable basis with the manning levels we’ve currently got - if it was, why do we have 2 tied up?
We can look at this from another way. We know the T23s are not in good shape hence the life ex It could be that they simply can't be used until the life ex is done this could also be why they have seen little use as a way to keep them going until life ex is complete. Again we know T45 has had it problems and are just starting to come back on line after refits

Caribbean
Senior Member
Posts: 2784
Joined: 09 Jan 2016, 19:08
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Caribbean »

Tempest414 wrote:We can look at this from another way. We know the T23s are not in good shape hence the life ex It could be that they simply can't be used until the life ex is done this could also be why they have seen little use as a way to keep them going until life ex is complete. Again we know T45 has had it problems and are just starting to come back on line after refits
I would agree with this and the earlier post about being 1000 under strength. There is a lot of juggling going on at the moment over numbers and costs. The flip side of the coin to "we have too few crew to man these ships" is "do we need crews for unserviceable ships". The aim, surely, is to have the crews trained and available at the same time as the ships are, which involves a great deal of very detailed forward planning on both the personnel and the financial sides.
The pessimist sees difficulty in every opportunity. The optimist sees the opportunity in every difficulty.
Winston Churchill

NickC
Donator
Posts: 1432
Joined: 01 Sep 2017, 14:20
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by NickC »

Norewegian Navy removing Sting Ray LWTs from Helge Ingstad, before raising ship, thought safer to detonated LWTs as had been in water than refurbish.
You do not have the required permissions to view the files attached to this post.

Poiuytrewq
Senior Member
Posts: 3958
Joined: 15 Dec 2017, 10:25
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Poiuytrewq »

NickC wrote:Norewegian Navy removing Sting Ray LWTs from Helge Ingstad, before raising ship, thought safer to detonated LWTs as had been in water than refurbish.
That is quite an image :thumbup:
image.jpg

User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by ArmChairCivvy »

Yes, and a pity they were not heavy torps.

A camouflages berth could have been created for the same bother ;) .
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

donald_of_tokyo
Senior Member
Posts: 5545
Joined: 06 May 2015, 13:18
Japan

Re: Current & Future Escorts - General Discussion

Post by donald_of_tokyo »

shark bait wrote:
SW1 wrote:The U.S. Navy’s Sea Hunter unmanned surface vessel has become the first ship of any description to ever sail from San Diego, California to Pearl Harbor, Hawaii and back without the need of a crew for navigation and steering.
It's quite an achievement and it begs the question, would something similar be useful to the UK in the North Atlantic?
Sure!
But, this trial is for steaming autonomously, not necessarily related to ASW.

I think ASW drones are evolving in two ways:
- ship carried drones, ~12m length.
- self deploy drones, ~40m length.
Both will be restricted in its sea keeping, needing good way to properly station their VDS/TASS. And I think they will grow. They will rapidly become expensive kits in near future, may be even replacing (at least part of) Merlin fleet or a few escorts (in its costs). Nonetheless, they will be very important assets.

Let's see how they evolve.

User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by ArmChairCivvy »

SW1 wrote:The U.S. Navy’s Sea Hunter unmanned surface vessel
is a bespoke development to extend the areas covered in/ duration of ASW effort.
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

User avatar
shark bait
Senior Member
Posts: 6427
Joined: 05 May 2015, 21:18
Pitcairn Island

Re: Current & Future Escorts - General Discussion

Post by shark bait »

It's the self deploying kind that look the most attractive. It's not too hard to imagine a small fleet of those operating out of Faslane providing broad area surveillance across the North Atlantic. Between those and the MPA's could we remove the requirement to have an ASW Frigate operational around the UK?
@LandSharkUK

User avatar
ArmChairCivvy
Senior Member
Posts: 16312
Joined: 05 May 2015, 21:34
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by ArmChairCivvy »

shark bait wrote:It's the self deploying kind that look the most attractive
Yeah; that's where the innovation with Sea Hunter lies (add: endurance, single purpose, no crew, no tea breaks, no head required...).
Ever-lasting truths: Multi-year budgets/ planning by necessity have to address the painful questions; more often than not the Either-Or prevails over Both-And.
If everyone is thinking the same, then someone is not thinking (attributed to Patton)

Poiuytrewq
Senior Member
Posts: 3958
Joined: 15 Dec 2017, 10:25
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Poiuytrewq »

shark bait wrote:It's not too hard to imagine a small fleet of those operating out of Faslane providing broad area surveillance across the North Atlantic.
Maybe, but if so they will need to be a lot bigger than 40m.

User avatar
shark bait
Senior Member
Posts: 6427
Joined: 05 May 2015, 21:18
Pitcairn Island

Re: Current & Future Escorts - General Discussion

Post by shark bait »

Why would they ?
@LandSharkUK

Poiuytrewq
Senior Member
Posts: 3958
Joined: 15 Dec 2017, 10:25
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Poiuytrewq »

shark bait wrote:Why would they ?
Are you proposing to tow a VDS/TAS and in what sea state do you intend to them to operate in?

SW1
Senior Member
Posts: 5657
Joined: 27 Aug 2018, 19:12
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by SW1 »

Poiuytrewq wrote:
shark bait wrote:It's not too hard to imagine a small fleet of those operating out of Faslane providing broad area surveillance across the North Atlantic.
Maybe, but if so they will need to be a lot bigger than 40m.
Poiuytrewq wrote:
shark bait wrote:Why would they ?
Are you proposing to tow a VDS/TAS and in what sea state do you intend to them to operate in?
There plenty of videos showing the Severn All weather lifeboat deploying it storm force 11 and hauling big boats in big seas and she’s only 17m.

Caribbean
Senior Member
Posts: 2784
Joined: 09 Jan 2016, 19:08
United Kingdom

Re: Current & Future Escorts - General Discussion

Post by Caribbean »

.... and, of course, there is the point that, as soon as you remove the crew, you no longer have to operate within the limits of human physiology, so you can operate in conditions that would be unacceptable to a human crew.